Skip to the content
When Is Wipe

51,126 players on 11,526 servers

Offline #15,948

MS Project | SOLO/DUO

80.221.91.195:28015 checked 11d ago

moddedcarbon

Players

Now0/25
Peak, 48 hours–
7-day average0
7-day peak–
No hourly history yet.

Hourly average and peak, UTC.

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

usual gap
8.5 days
between real wipes
wipe-day peak
1
players, last three wipes
crowd held
0%
else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC 18d ago 1 – running 1
Thu 17 Sep, 20:03 UTC 26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Similar servers

the same kind of game, then region, group limit, rate and wipes
ShockRust | Blue | NoLimitno group limit · 127 on average
128/300
RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 13.10EU · groups of 16+ · weekly · 107 on average
153/225
МИНИ-КАРТА 2Х | STORM | FPS+ 10.10EU · groups of 8+ · weekly · 90 on average
89/100
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 10.10EU · groups of 16+ · monthly · 86 on average
38/1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РОССИЯ 08.10EU · groups of 16+ · monthly · 76 on average
10/1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|EU MAIN 11.10EU · groups of 16+ · monthly · 73 on average
34/700

Quick answers

from the figures on this page

Player counts

How busy is MS Project | SOLO/DUO?

At present MS Project | SOLO/DUO shows as offline; its last appearance was 11 days 14 hours ago.

How does MS Project | SOLO/DUO rank against other Rust servers?

For player hours in the last seven days, MS Project | SOLO/DUO holds rank #15,948 and is in the top 70% of all ranked servers.

Wipe times

What does wipe day look like on MS Project | SOLO/DUO?

At their busiest, its recent wipes drew 1 players on average. 0 hours after the latest wipe, the crowd peaks. The crowd stayed above half that peak until the next wipe in 0% of its recent wipes. The crowd fell under half by day 1 when it did not hold.

What is the wipe schedule on MS Project | SOLO/DUO?

Its rhythm is not yet clear from the wipes of MS Project | SOLO/DUO on record. Next force wipe: Thursday 5 November at 19:00 UTC, when all Rust servers wipe. The map has been running for 18 days 2 hours.

Server details

Is MS Project | SOLO/DUO online, and how reliable is it?

Live status for MS Project | SOLO/DUO: offline, last seen 11 days 14 hours ago. 0 of 168 hours were online in the last 7 full days, 0% uptime. When Is Wipe has tracked it since 13 September 2026.

Which version of Rust does MS Project | SOLO/DUO run?

Rust network protocol 2633 and build 162929 on Linux is what MS Project | SOLO/DUO runs. Steam updates your game, so the protocol matches when you join.

Where is MS Project | SOLO/DUO located?

No region is published by MS Project | SOLO/DUO. When Is Wipe does not look up where the machine stands; it shows where a server says it is. 80.221.91.195:28015 is its address.

Tags, lists

Which When Is Wipe lists include MS Project | SOLO/DUO? And filters?

The When Is Wipe lists MS Project | SOLO/DUO fits are: Best modded Rust servers. It appears under these filters on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

What do the server tags on MS Project | SOLO/DUO mean?

gmrust (Game mode): Standard survival is the game mode; mp25 (Max players): Capacity is 25 slots; ts8 (Group limit): Default team size applies: 8 maximum; v2633 (Protocol): Your game version has to be on protocol 2633 to connect; cs162929 (Build): The game build is 162929; ptrak (Networking): RakNet is the network layer in use here, as standard for the game; $r? (Region code): No region code has been set; ^z (Modded): Plugins or modified settings put this server in the Modded section; ^y (Carbon): This server runs Carbon for plugins are the tags MS Project | SOLO/DUO publishes, and the game's server browser reads them. At the top of this page you can see its current players, queue and world creation time, which are in the tags too.

Map and rules

What rules does MS Project | SOLO/DUO enforce? And settings?

MS Project | SOLO/DUO's name makes no mention of a gather rate. The group limit is 8 players, the default. The game mode for this server is survival, standard survival: gathering, building, raiding. You can fight and raid other players. Listed as Modded, it uses plugins or settings that change the game. Plugins: Carbon. VAC is on.

Which map does MS Project | SOLO/DUO run?

MS Project | SOLO/DUO runs a procedural map of size 3,500 with seed 789936933, generated by the game. With the same size and seed, the map is identical and can be seen on RustMaps from here.

Join

How do I join MS Project | SOLO/DUO?

Open Rust, press F1, and type client.connect 80.221.91.195:28015 in the console. Alternatively, use Launch Rust on this page to open the game via Steam and connect.

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Standard survival is the game mode.
mp25
Max players Capacity is 25 slots.
ts8
Group limit Default team size applies: 8 maximum.
v2633
Protocol Your game version has to be on protocol 2633 to connect.
cs162929
Build The game build is 162929.
ptrak
Networking RakNet is the network layer in use here, as standard for the game.
$r?
Region code No region code has been set.

Mods and access

^z
Modded Plugins or modified settings put this server in the Modded section.
^y
Carbon This server runs Carbon for plugins.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.